How to Estimate Concrete for a Slab: Step by Step

Published October 30, 2026 · Updated October 30, 2026 · 7 min read

Ordering concrete is one of the few jobs where a small mistake is expensive in both directions. Order too little and you have a cold joint or a truck waiting while you scramble for more. Order too much and you pay for concrete you have to dump. The math is simple once you see it laid out. This guide walks through a complete example, a 16 by 12 foot patio, from the first measurement to the shopping list, and then covers the gravel base and the rebar.

If you want the answer without the walkthrough, the free Concrete Slab Calculator does all of it and shows its work. The steps below use the same formulas, so the numbers here are the numbers it gives.

The one conversion that matters

Concrete is sold by the cubic yard from a ready-mix plant, and by the bag at a home center. One cubic yard is 3 feet by 3 feet by 3 feet, which is 27 cubic feet. Almost every estimating mistake comes from mixing feet, inches and yards, so convert everything to feet first, do the multiplication, and divide by 27 at the end.

Step 1: Measure the area and choose a thickness

Measure the length and width of the slab in feet. For an irregular shape, split it into rectangles, figure each one, and add them. Measure to the outside of the forms, because that is where the concrete will actually stop.

Thickness is the part people guess at. A 4 inch slab is the usual choice for patios and walks. Driveways and garage floors are often poured thicker, commonly 5 to 6 inches where heavier vehicles will use them, and a structural slab may be specified by an engineer. Your plans, your local code or your supplier decides the real number. Because thickness is the one input that changes the volume the most, it is worth confirming before you order.

Step 2: Find the volume

Cubic feet = Length (ft) × Width (ft) × Thickness (in) ÷ 12

Cubic yards = Cubic feet ÷ 27

Dividing the thickness by 12 turns inches into feet. For the example patio, 16 ft long, 12 ft wide and 4 inches thick:

Worked example: 16 ft × 12 ft × 4 in

  • Area: 16 × 12 = 192 square feet
  • Volume: 192 × 4 ÷ 12 = 64 cubic feet
  • Cubic yards: 64 ÷ 27 = 2.37 cubic yards

Step 3: Add waste, then round up

Real slabs take more concrete than the geometry says. The ground is never perfectly flat, forms bow slightly, and some concrete is lost to spills and to the wheelbarrow or chute. A starting allowance of 10% is common. If your subgrade is rough or you are pouring against an uneven surface, add more. If it is a clean, well-prepared base, you might use 5%.

Worked example, continued

  • 64 cubic feet × 1.10 = 70.4 cubic feet
  • 70.4 ÷ 27 = 2.61 cubic yards

Ask your plant how it sells small orders. Many sell in quarter-yard steps, which would make this order 2.75 yards. Many also charge a short-load fee for small loads, so for a patio this size, it is worth asking for the price of 2.75 yards and of the minimum load.

Step 4: Bags or a truck?

For small jobs, bagged mix is practical. Bag yields are printed on the bag, and the usual figures are about 0.6 cubic foot for an 80 lb bag, 0.45 for 60 lb and 0.3 for 40 lb. Divide the volume with waste by the yield, then round up to a whole bag:

Bag sizeYield (cu ft)Bags for 70.4 cu ft
80 lb0.60118
60 lb0.45157
40 lb0.30235

Notice what 118 bags means: 118 × 80 lb is 9,440 pounds, nearly five tons, and every bag has to be mixed and placed before the batch stiffens. A slab this size is a ready-mix job. A common rule of thumb is that anything over about a cubic yard is better ordered from a truck, with bags kept for small repairs, post holes and steps. Check the yield on your actual bag, because brands differ, and change the number in the calculator to match.

If you ever need to compare, one cubic yard equals 45 bags of 80 lb mix (27 ÷ 0.6), 60 bags of 60 lb mix (27 ÷ 0.45), or 90 bags of 40 lb mix (27 ÷ 0.3).

Step 5: Don't forget the base

Concrete should sit on a compacted base, commonly about 4 inches of crushed stone or gravel, so water drains and the slab doesn't settle unevenly. The base uses the same area as the slab, so it is a second volume calculation:

Worked example: 4 in gravel base under the same patio

  • 192 × 4 ÷ 12 = 64 cubic feet = 2.37 cubic yards
  • Gravel is sold by the ton. At about 1.4 tons per cubic yard, that is 2.37 × 1.4 = 3.32 tons

Gravel weight varies by type and moisture, so ask your supplier for their tons-per-yard figure and use that instead of 1.4. Order a little extra, because compacting reduces the volume.

Step 6: Reinforcement

Many slabs include steel to hold cracks tight, and what you use depends on the design. Some use welded wire mesh, some use fiber in the mix, and some use rebar. Walks and small patios often need little or none; driveways, garage floors and anything structural are different. Follow your plans or code. If you are using a rebar grid, the count is a simple pattern:

Worked example: rebar every 12 in, kept 3 in from the edges

  • Bars running the 16 ft way: 12 bars, each 15.5 ft long (16 ft less 3 in at each end)
  • Bars running the 12 ft way: 16 bars, each 11.5 ft long
  • Total: 12 × 15.5 + 16 × 11.5 = 370 linear feet
  • Add the same 10% waste: 370 × 1.10 = 407 feet
  • In 20 ft sticks: 407 ÷ 20 = 20.35, which rounds up to 21 sticks

This counts total length, so it treats every offcut as usable. Real cutting can leave pieces you can't use, and bars that are shorter than the slab need to overlap where they meet, so the 10% waste is the minimum cushion, not a generous one. Rebar should sit up off the ground on chairs or blocks so it ends up in the middle of the slab, not on the dirt.

Step 7: Price it

Cost is the last step, and it only works if you use your own prices. Prices change by week and by town. Take the quantity for each item, multiply by the price you were quoted, and add them up: concrete (yards or bags), gravel (tons), rebar (sticks), plus delivery, forms, and anything for finishing and curing. Two phone calls to different suppliers will usually teach you more than any average price you could read online.

Quick reference for ordering, before waste:

Slab area4 in thick5 in thick6 in thick
100 sq ft1.23 cu yd1.54 cu yd1.85 cu yd
200 sq ft2.47 cu yd3.09 cu yd3.70 cu yd
300 sq ft3.70 cu yd4.63 cu yd5.56 cu yd
400 sq ft4.94 cu yd6.17 cu yd7.41 cu yd

Common mistakes

  • Mixing units. Thickness in inches and length in feet in the same multiplication gives a wrong answer by a factor of 12. Convert first.
  • Forgetting waste. Ordering exactly the geometric volume nearly always leaves you short.
  • Ignoring the base and the forms. The slab is the smallest cost on some jobs; gravel, forms, labor and delivery add up.
  • Using bags for a big pour. Hundreds of bags need many hands and a lot of time. Past roughly one cubic yard, price a truck.
  • Trusting a bag's yield from memory. Read the printed yield on the bag you buy.
  • Pouring without a plan for joints and curing. Control joints are commonly spaced about two to three times the slab thickness in inches, measured in feet, so a 4 inch slab gets joints roughly every 8 to 12 feet. Fresh concrete should also be kept damp and protected from freezing while it cures, often for several days. Your supplier can tell you what suits your mix and weather.

Questions people ask

How many bags of concrete are in a cubic yard?

About 45 bags of 80 lb mix, 60 bags of 60 lb mix, or 90 bags of 40 lb mix, based on the common yields of 0.6, 0.45 and 0.3 cubic foot per bag. Always check the yield printed on the bag.

How thick should a concrete slab be?

Four inches is the usual thickness for patios and walks. Driveways and garage floors are often thicker, and some slabs are specified by an engineer. Use your plans or local code.

How much extra concrete should I order?

A 10% allowance is a common starting point, and more if the ground is uneven. The price of being a little over is usually smaller than the price of running short.

Does the calculator include cost?

Yes. The Concrete Slab Calculator adds up concrete, gravel and rebar and totals the job, using the prices you type in. It never fills a price in for you.