Construction Site Rain Log

Type a job-site address in South Carolina, North Carolina or Georgia and get the daily rainfall for the days you pick, from the nearest rain gauge, a radar analysis at the site and the nearest airport, ready to download or print.

New site with no street address? Use the ZIP code or GPS point (for example 34.7821, -82.5122). We look up rainfall and don't keep your address.

Add project details for the printout (optional)

These stay in your browser. They are only used to head the printout and the downloads.

How to use it

  1. Enter the job-site address. A new subdivision with no street address yet? Use the ZIP code, or paste the GPS point from your phone as latitude, longitude.
  2. Pick the days. Last week (Sunday to Saturday) and last month are one tap, and you can pick your own dates up to 62 days.
  3. Press Get rainfall, choose which source goes in your log, and look at the days that are highlighted.
  4. Download the Excel log (or a plain CSV) for your records or print the page as a one-page Rain Log for the SWPPP binder.

The newest day you can pick is yesterday. Rainfall records for today aren't complete until tomorrow.

What the permits say about rainfall

These are plain-English summaries of the construction stormwater permits as they read in October 2026. Open the permit before you rely on them, because permits get reissued and a county or city can add rules of its own. This page isn't legal advice.

South Carolina (permit SCR100000, effective March 30, 2026)
  • Inspections: at least once every calendar week, never more than 9 days apart. The permit recommends assessing your BMPs within 24 hours after the end of a storm of 1.0 inch or more.
  • Rain gauge: an on-site gauge is strongly recommended. The permit also lets you use "a certified weather record (such as a personal weather station or an airport) located within reasonable proximity of the construction site" instead. Keep the amounts in a Rain Log in your SWPPP. Each weekly inspection report must show the rainfall for the day of the inspection and any significant events (0.5 inch or more) since the last one.
  • Monthly report: SCDES can require one case by case. Form 1356 asks for the total rainfall for the inspection month in item 3.
  • Source: SCDES construction general permit, Section 4.2.
North Carolina (permit NCG010000, effective April 1, 2024)
  • Rain gauge: the permit requires an on-site rain gauge and a daily rainfall amount, with "zero" written on dry days. Another on-site device needs Division approval. The permit has no wording that lets a nearby weather station take the gauge's place, so use this page to check your gauge or cover a gap, not to replace it.
  • Inspections: at least once every 7 calendar days and within 24 hours of a rain event of 1.0 inch or more in 24 hours. A rain inspection restarts the 7-day count.
  • Records: keep the last 12 months of inspection records on site and the rest for 3 years after the project is complete. The state's monitoring form (Rev. 07/01/2020) has a Part 1A for daily rainfall.
  • Source: NCDEQ permit NCG010000, Part III.
Georgia (permits GAR100001, GAR100002 and GAR100003, in force since August 2024)
  • Rainfall records: measure and record rainfall once every 24 hours on disturbed areas that aren't finally stabilized (not required on non-working Saturdays, Sundays and federal holidays). The data must be "representative of the monitored activity." The permits don't mention rain gauges or substitute weather stations either way.
  • Inspections: every 7 days (every 14 days under GAR100002 for infrastructure), and within 24 hours of the end of a storm of 0.5 inch or more. If the storm ends after 5 PM on a Friday, or on a non-working weekend or holiday, the deadline is the end of the next business day.
  • Sampling: turbidity sampling is tied to rain events of 0.5 inch or more, and the sampling report must show the rainfall amount.
  • Records: keep daily rainfall with your plan until the Notice of Termination, plus 3 years.
  • Source: Georgia EPD construction stormwater permits, Part IV.

Where the numbers come from

Rain gauge. The closest active gauge in the CoCoRaHS volunteer network, which is run by people with standard gauges and used by the National Weather Service. Each reading is the rain in the 24 hours before the reading time. A gauge read at 7 AM records Saturday afternoon's storm under Sunday's date, so the page shows the reading time and, for morning gauges, the next morning's reading too.

Radar and gauge analysis. An estimate for the exact spot, built from radar adjusted with gauge data by Iowa State University's Iowa Environmental Mesonet. It fills in where gauges are far away. Recent days can be revised.

Airport. The nearest National Weather Service or FAA weather station, which reports hourly all day long. It's the cleanest calendar-day record, but it can be many miles from your site.

Rain is patchy. A thunderstorm can drop two inches on one side of town and a quarter inch on the other, so the three sources can differ a lot on a storm day. That's normal, and it's why the page shows distance and lets you choose.

Need an on-site gauge?

Check today's price:Home DepotLowe's

Common mistakes

  • Writing zero for a day with no reading. A missing reading isn't a dry day. This page leaves it blank, or fills it from another source and marks it.
  • Missing the storm because of the reading time. If your gauge or the nearest one is read in the morning, the big afternoon storm is in the next morning's number.
  • Treating a trigger as a calendar day. Permits count storms and 24-hour periods. Rain that crosses midnight can meet a trigger even when neither day does, and the page points those out.
  • Leaning on a distant airport. Twelve miles is a different weather system on a summer afternoon. Check the distance beside each source.
  • Replacing the on-site gauge in North Carolina. The permit asks for one.

Questions people ask

Is this a certified weather record?

No. It's compiled from public records and shows where each number came from. Airports are the kind of source South Carolina's permit names, but whether a particular gauge or source is acceptable is up to your permit and the reviewing agency. If you're unsure, ask them before you rely on it.

Do you keep my address?

No. Your address is sent to our server only to look up rainfall, along with the U.S. Census Bureau's address service and the weather data services. We don't store it or write it to a log, and it isn't put in the page address. See the privacy policy.

What does "trace" mean?

A trace is rain too light to measure, under 0.01 inch. It counts as zero in the total, and the page marks it so you can see it.

Why doesn't it match my phone's weather app?

Most weather apps show forecasts and computer models. This page uses measured gauge readings and airport records, with a radar-based estimate beside them.

What about other states?

South Carolina, North Carolina and Georgia work today. Other states' rules and forms differ, so they're added one at a time after the permit is read.

Gauge data: CoCoRaHS (Community Collaborative Rain, Hail and Snow Network). Radar analysis: Iowa Environmental Mesonet. Weather stations: National Weather Service. Addresses: U.S. Census Bureau.